Water Documents


1988-05 Cumberland County Water Study – Barge Waggoner

1997-11 Rural Water Improvement Plan for Cumberland County – Cumberland County PC & State Local Planning Office

1998-12 Cumberland County Regional Water Supply Study Prelim Engineering Report Exec Summary – Army Corps

1999-11 Prelim Engineering_Watts-Bar Water

2001-12 Investigating The Feasibility of Constructing Raw water Impoundments Downstream of Meadow Park Lake – LDA

2003-04-10 Report on the Expansion of Meadow Park Dam and Lake – ECE

2004-04-05 Rock Bore Logs – ECE

2005-9-6 Hydrologic Investigation on Meadow Park Lake & Dam – ECE

2006-12-13 Addendum 1 Land Use Memo Phase II Water Supply Study – GKY

2007-02-27 Land Use Assumptions for Phase II Regional Water Supply – Army Corps

2007-05-08 Minutes on Fall Creek Falls – Crossville City Council Minutes

2007-11-15 Water Supply Assesment During Drought – ECE

2008-01-09 Project Scope Lake Tansi Water Harvesting Project – ECE

2008-02-12 Lake Tansi Water Harvesting Analysis – FECS

2008-09-08 Cumberland County Drought Indentification – GKY

2008-09-22 Addendum 3 Water Conservation Plan Memo – GKY

2008-09-23 Addendum 2 Water Needs Assessment Memo – GKY

2009-03 Final Report Cumberland CRWSS WNA & WCP – GKY

2009-9-08 Drinking Water Facilities Plan (Tansi Raw Water Harvesting) – ECE

2010-01-20 Cumberland County Drought Identification and Existing Sources Yield Analysis Final Report Complete Set of Graphs

2010-01-20 Cumberland County Drought Identification and Existing Sources Yield Analysis Final Report

2012-02 Rock Boring Logs – ECE

2012-07-12 Water Supply Plan Assumptions Memo – GKY

2012-10-26 Regional Water Supply Task 1 Tech Memo – GKY

2014 Annual Utility Rate Surfey PowerPointPDF – East Tennessee Development District

2014-08-21 Scope of Work Cumberland County Regional Water Supply Plan – Phone Conference

2014-08-26 Revised Scope of Work (approved by council on 2014-09-09) – Army Corps

2015-09-15 Cumberland County Task 3 Water Needs Summary Memo – GKY

2015-10-15 Cumberland County Task 3 Water Needs Summary Memo – GKY

2015-10-20 Regional Water Supplly Plan Power Point – GKY – Army Corps

2015-10-20 Regional Water Supply Task 3 Water Needs Summary Memo – GKY

2018-02-05 Raw Water Presentation Wauford

2019-10-01 Raw Water Capacity Master Plan Presentation Wauford

2020-03-19 Raw Water Capacity Master Plan Wauford

2023-09 History of Cumberland County Water Supply – Randall Kidwell